Announcement

Collapse
No announcement yet.

Add'l gas line into TDD-4

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Add'l gas line into TDD-4

    Hi! This is my first posted question, so please bear with me. I've just acquired a TDD-4 behemoth in great shape and have a quandary about running an additional Co2 line into the unit. It's got 3 2-tap towers and I would like to potentially run Guinness/a stout from one of them; thus the need for the separate, unique line. There's not a lot of room given the entry hole made by the manufacturer, and the current line feeds all six current couplers with a gas distributor mounted inside the unit. I'd like to add a bank of secondary couplers in place of the distribution feeder (so as to run 4 diff. beers and a root beer for the kids), but the separate line/beergas tank for stouts is my current focus. Any thoughts?

  • #2
    Since you'll need a seperate beer gas tank and regulator, you might have room to just keep them inside the unit.
    ____________________________________________
    Our beer, which commeth in barrels, hallowed be thy drink
    Thy will be drunk, I will be drunk, at home as it is in the tavern
    ____________________________________________


    Home Brew IPA

    Comment


    • #3
      If you decide to drill an extra hole for the new line it should not be much of a problem. The only areas to stay away from are near the evaporator coil & the back corner where the compressor is located. You don't want to be pokin' holes in any refrigerant lines.


      THE ICEMAN
      My conversion ===------->> KILLER KEGERATOR
      "Without question, the greatest invention in the history of mankind is beer. Oh, I grant you that the wheel was also a fine invention, but the wheel does not go nearly as well with pizza."
      -Dave Barry-
      "We old folks have to find our cushions and pillows in our tankards.
      Strong beer is the milk of the old."
      -Martin Luther-

      Comment

      Working...
      X