I am looking for some help/advice with a new keg system design. I would like to have 2 of these http://www.micromatic.com/draft-keg-...S-144-PSS.html. There is a 12x10 walk in cooler directly under the bar in the basement. Was thinking about drilling a 4'' hole in the top of the walk in and through the floor and bar top. connected by a 4'' pvc pipe. a pipe per tower. The pipe would be around 5' long.
Any information on components or anything else would be greatly appreciated.
Any information on components or anything else would be greatly appreciated.
Comment