Hey guys doing first big glycol system build. Have done a lot of forced air and direct draw and troubleshooting glycol systems but never from scratch. Want to make sure I have everything for a smooth install. Here's my list of parts and account info.
40ft run with 16 faucets
Metro h tower 16 faucet with drip tray
Mmpp4301-pkg power pack with dual pumps
Two 8 product trunk lines
Mm200-LD gas blender
Primary high pressure c02+ n20 regs
16 secondary regs
Two 1/4 glycol install kits each kits does 10 lines
4 gals of mm glycol
SS wall bracket jumpers
3/8 jumper line
Keg Couplers
Braided and vinyl air line
Misc clamps,moister,foil tape etc..
Trunk line mounting clamps
Account is putting in the L5-30P outlet for power pack
Power pack will be located about 8ft from walk in with plenty of ventilation
Already figured out my chocked line length to balance system
Please let me know if you guys think there is anything missing or things to watch out for during install thanks!
40ft run with 16 faucets
Metro h tower 16 faucet with drip tray
Mmpp4301-pkg power pack with dual pumps
Two 8 product trunk lines
Mm200-LD gas blender
Primary high pressure c02+ n20 regs
16 secondary regs
Two 1/4 glycol install kits each kits does 10 lines
4 gals of mm glycol
SS wall bracket jumpers
3/8 jumper line
Keg Couplers
Braided and vinyl air line
Misc clamps,moister,foil tape etc..
Trunk line mounting clamps
Account is putting in the L5-30P outlet for power pack
Power pack will be located about 8ft from walk in with plenty of ventilation
Already figured out my chocked line length to balance system
Please let me know if you guys think there is anything missing or things to watch out for during install thanks!