Beer Forum

Search Forum                       Advanced Search

  #1 (permalink)  
Old 12-21-2005, 04:04 PM
edfasso edfasso is offline
Junior Member
 
Join Date: Dec 2005
Location: , , USA.
Posts: 1
Default New Installation

I am in the design process for a sports bar. There are 2 options being discussed for tap beer.
1. Mount the towers on the back bar immediately next to the walk in.
2. Mount the towers on top of bottled beer coolers about 11 feet from the walk in.
If we go with option 2, would we need to install beer coolng lines?
Can we split the feed lines so one keg can seve 2 towers?

We are planning on 12 draft beers, one will be Guinness, and 15-20 bottled beers. We anticipate having to install 2 complete tower systems.
Reply With Quote
  #2 (permalink)  
Old 01-04-2006, 06:33 PM
Scott Zuhse Scott Zuhse is offline
Super Moderator
 
Join Date: Mar 2005
Posts: 1,565
Default

The most efficient method of dispensing draught while assuring quality is to mount the shanks and faucets on a wall plate assembly directly onto the wall of the walk in cooler. Utilize a shadow box built into the wall behind the wall plate (with short shanks) to assure constant temperature to the faucets.

The key to quality is to pressurize the keg with 22 PSIG consisting of a 60% CO2 / 40% Nitrogen for ales and lagers - 25% CO2 / 75% Nitrogen for nitrogenated or stout products. Install a dual blender to accomplish this. The higher pressure will compensate for temperature fluctuations while the blends maintain the prescribed recipe of carbonation. End result - low pour cost and high resales. Keep the system and glassware clean, refrain from tapping kegs that have not acclimated to the cooler and make tons of money on draught.

If you absolutely must dispense from towers away from the cooler then utilize a glycol chiller. Use separate conduits from a "Y" at a wall plate assembly to the towers. Never "T" the conduit at the towers.

The pressure system should be identical to the above mentioned. Do not skimp on the cost of these systems. I guarantee that if you do, you will pay much more in waste down the road.

Scott Zuhse, Instructor Micro Matic Dispense Institute
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Drain Line Installation flbowhunter Kegerators & Kegerator Kits @ Home 2 09-29-2006 08:58 AM
FOB Installation edramshaw System Components - Beer Side 4 07-10-2006 07:10 PM


All times are GMT -7. The time now is 05:01 PM.

Note:
Micro Matic’s Draft Beer Discussion forum is a public service which allows our members to share their draft beer knowledge and for visitors to view their discussions. While Micro Matic's Dispense Institute instructors and knowledgeable staff are often participates in the forum, Micro Matic does not attempt to verify information posted by members. The information which members post are personal views, and may not reflect the views of Micro Matic. Micro Matic takes no responsibility and assumes no liability for any information posted by members, or results that occur from the information. Micro Matic reserves the right to monitor, remove or edit content at its discretion.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.0.0 RC6 © 2006, Crawlability, Inc.