New set up
Hey all new to the board and pretty new to setting up a kegerator. Anyway Im looking to convert a Sanyo 4912 in the coming weeks (tower conversion) and I was wondering if I have the necessary pieces to complete the conversion.
- 1 Corny Keg (5 gallon) with quick ball-lock threaded disconnects
- 1 5lb CO2 tank with dual guage regulator
- 1 gas line with appropriate coupler
- 1 beverage line (may need new one this is too short) with appropriate coupler
This is what i am looking to order to complete the set up
- 1 12" (3" diameter) AUC Metalfab tower with two faucet holes (I will only use one faucet for the time being, until beer production increases. Seal the other hole until such time)
- 1 Beer Hose Assembly (micromatic) to replace the one above
- 1 Fitting, 5 Gallon Product Tank (micromatic) for the new hose
- Few Small Screw Clamp to attach the hose and coupler
- 1 Elbow Shank Assembly from micromatic for my faucet
- 1 Shirron forward sealing faucet
- 1 Shut Off with Check Valve from micromatic I heard this is a good idea for homebrew kegs
- Some sort of sanitizer
I just want to know if there is anything glaring I am omitting with this set up. Also how easy is it to set up the beverage line upto the faucet? Does the beer hose assembly have all the necessary parts to do the hook up to the faucet/shank.
Thanks in advance...
|