Did some research on tower cooling and i can attribute my 'initial' foam issue on first pour to a warmer tower. Once I get the warmer beer out she seems to pour fine....
I am assembling the material to make a tower cooler and upgrade the 'insulation' of the tower and cap...BUT my question is it necessary to have a return line to the bottom of the unit for return air?
In working with HVAC contractors within my job it is critical to have return air so I am guessing to be effective with this as well, a return air line is necessary.
I was planning on feeding flexible plastic tube to the top of the tower as the feed air and one at the bottom dropping to the bottom of the unit as the return as the cold air enters the tower it will wash over the beer feed tubing and drop tot he return air line....
seem reasonable?
I am assembling the material to make a tower cooler and upgrade the 'insulation' of the tower and cap...BUT my question is it necessary to have a return line to the bottom of the unit for return air?
In working with HVAC contractors within my job it is critical to have return air so I am guessing to be effective with this as well, a return air line is necessary.
I was planning on feeding flexible plastic tube to the top of the tower as the feed air and one at the bottom dropping to the bottom of the unit as the return as the cold air enters the tower it will wash over the beer feed tubing and drop tot he return air line....
seem reasonable?
Comment