Up and running
Got the equipment yesterday. The shipping was lightening fast, it was supposed to take 3-5 days and I got it in 2.
It only took about 30 minutes to set everything up. I'd suggest for anyone doing this type of conversion (3" tower from 2 1/2") take your time with the drilling. I did and it paid big dividends. It'd be pretty easy to muck up the top of the unit.
I'm picking up gas and my first kegs this weekend. I'll report back on the first pours.
|