Thread: Tower Cooling
View Single Post
  #2 (permalink)  
Old 05-12-2007, 03:39 PM
Scott Zuhse Scott Zuhse is offline
Super Moderator
 
Join Date: Mar 2005
Posts: 1,652
Default

Use a blower with a bracket and then attach flex tube. Route flex tube into tower.

Using a one inch hole saw blade, preferably cut a hole through a wall of the box that has the least chance of interfering with the refrigeration or other factors such as a wire. After you have broken the skin of one surface, stop and inspect the wall for these factors that may result in damage if you continue. Once inspected and comfortable with no obstructions, proceed through the wall completely. As to the pigtail, assure that it is long enough and connect to the motor after routing through the keg box wall. Seal the hole with silicone or plumbers putty.
__________________
Scott Zuhse, Instructor Micro Matic Dispense Institute
Reply With Quote