Equip needs
I'm wanting to run 10 drafts immediately (maybe more in the future) and have a run of about 60' total from walkin cooler to tap towers. What length of Glycol machine do I need? Do I need to oversize, is it better to oversize? Also, what size trunk is better in the end?
3/8 or 5/8? Just looking for the smartest way to start the system because I don't want to run additional equipment later because I'll never have more than 12 drafts total.
Thanks
|