I saw somewhere (may have been on this site) where someone got a project box and cpu fan from Radio Shack and built a tower cooler/blower that used a dishwasher drain line for the tubing up into the tower. I basically copied their ideal and it works great for me. Micromatic also sells tower blowers and tubing that goes up into the tower.
The beer line will be uninsulated in the freezer until it enters the insulated tower through the freezer lid.
I run two kegs off one CO2 tank. I just try to buy beers that have the same approximate pressure/temperature requirements. Seems like most will work with 14 psi @ 38 deg. I don't know if you would run into problems down the road with the unused CO2 outlet. If you did, just remove it and put a plug in its place or plug the line coming off the unused outlet.
Can't help you with a parts list. It really depends on how you want to set up your system. I'm sure different people would tell you buy some different parts, but the bones of the project would be the same.
Hope this helps and good luck. This is one project where you will definately be able to enjoy the fruits of your labor!
rr007
|