I likewise want to have a setup similar to the first post where the kegerator is under the full size bar I am planning. I'd rather not make the top of the kegerator part of the bar surface.
What would you suggest for a short run from kegerator through the bartop and a 14" tower w/ 2 taps? I could place the kegerator close to the bottom of the bartop, but would still have a total run of about 16-18".
Do the pre-made kegerators push air up into the tower that is mounted on top? Would this suffice for my scenario if I made a conduit from the kegerator through to the tower in your opinion? I was considering placing a thick metal bar in the middle of the 2 beer tubes to conduct some cold and wrap accordingly from some instructions posted on this website, but not sure how much cold will travel up the tower.
Thanks - love the website and wealth of info.
|