View Single Post
  #5 (permalink)  
Old 09-29-2005, 10:32 PM
Scott Zuhse Scott Zuhse is offline
Super Moderator
 
Join Date: Mar 2005
Posts: 1,654
Default

Check out the link to the 15 CFM blower & 1" flex tube. Mount the blower with screws out of the way of the keg and tapping equipment. Route the flex tube from the blower up into the tower just short of the shank behind the faucet. If uncomfortable with the wiring, consult with an electrician. Hangar brackets may make installation easier. Installing these components can assure constant temperature in the tower.

Scott Zuhse, Instructor Micro Matic Dispense Institute
Reply With Quote