View Single Post
  #1 (permalink)  
Old 01-26-2008, 01:19 AM
jdubslopro jdubslopro is offline
Member
 
Join Date: Jan 2008
Posts: 11
Default 90% done and eager to post pics

So I've been working like a madman trying to complete this project...the only thing I have left to do is mount my blower and wire it in...anyways...there's quite a few pics but I think they are pretty self explanatory...

Kegerator is in basement, plumbed up with 2" PVC to a tower directly on my kitchen sink. Has Johnson Controls A-419 Temp Controller, a 60 cfm blower. The liquor shelf is something that I built when I first bought the house 2 months ago, finally got the mirror and glass cut for it this week and I assembled tonight.

I just bought that Delta Faucet like 2 weeks ago...should've gone chrome to match the beer faucet...
Attached Images
File Type: jpg IMG_3532.JPG (81.7 KB, 209 views)
File Type: jpg IMG_3536.JPG (82.2 KB, 187 views)
File Type: jpg IMG_3538.JPG (95.6 KB, 174 views)
File Type: jpg IMG_3544.JPG (71.8 KB, 191 views)
File Type: jpg IMG_3556.JPG (90.5 KB, 200 views)

Last edited by jdubslopro; 01-26-2008 at 01:22 AM.
Reply With Quote