Drill it out
I have a kenmore kegerator myself and i recently added a 2 tap 3" tower on it. I ended up drilling a 2 3/8" hole over the existing hole and into the unit and putting a piece of 2" I.D. PVC pipe down in the hole. I Calked this in on both sides and than placed the 3" tower over the top of that. If you can slip both product lines down the current hole than it should work but you will get next to no cold air in the tower which will lead to a great deal of foaming with your beer. I hardly get any more foam on my first pour than usual with my opened up air way and i expect that to be solved as soon as i install a blower in the system. It's not a difficult install overall though so you should be able to do it with minimal time away from drinking
|